• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.

FLASH

Below, Solon High School students wait for more sandbags at the city wastewater treatment facility Wednesday. Students barricaded two buildings at the sewer plant to protect from the rising waters of Mill Creek.