• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.

Highway 965 stage 1 reopens, construction continues into stage 2

NORTH LIBERTY– On Friday, the first stage of Highway 965 re-opened as scheduled. Advanced Millwork, its tenants and businesses in Penn Landing can be accessed from Penn Street and Highway 965.
Crews moved forward with the 600-foot section to the north, between Dubuque Street and the previous construction. This work, which includes reconstruction and widening the road, replacing the railroad crossing, and the addition of sidewalks and recreation trails, is expected to last into November.
The Highway 965 intersections of Dubuque Street, Scales Bend Road and 240th Street will remain open this fall– and no detours are expected this winter– but will be rebuilt in the coming spring.
Weather permitting, some additional work could occur this fall, which could require intermittent closures on Dubuque Street. Any closures will be posted at northlibertyiowa.org/projects.