• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.

includes increased practice space for the school’s instrumental music and choir programs near the school’s Opstad Auditorium. Dausener said the performing arts project

including the demolition of a technology building that currently is an obstacle for the project.