Construction equipment sits where the Lake Macbride Boat Rental and concession building used to be. To avoid future flooding, the building is being moved up the hill, closer to the beach lodge in the park. In the meantime, soil stabilization structures are being established on the slope to minimize sediment running into the shallow bay. On the south side of the park, a sediment pond is being constructed south and west of the causeway; again to reduce runoff into the lake.
Recent comments
12 weeks 3 days ago
26 weeks 2 days ago