• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.

the city will now direct City Engineer Dave Schechinger to create a formal plan and cost estimates for the project. After this is completed